Clapham M2

With a podium deck over the underground basement Rydon needed to ensure there were no leaks onto parked cars beneath.

The waterproofing had to be very flexible and well bonded to the deck but from a practical site perspective also had to be applied very quickly.

There was also the problem of areas having to be done in the depths of winter. Eventually they chose the BASF Coniroof system and Capel as the applicator.

There were various difficult details (many posts fixed to the deck) which were easily waterproofed around with the liquid fast cure spray (cures in 30 seconds) membrane.

The job was completed on time and within budget.